Vertech Group delivered a pipeline inspection package to complete a 17.5 Km, 8” diameter pipeline in Ballera, South-West Qld. The team utilised equipment, including JME CR2 crawler systems, conventional film processing, mobile darkrooms, and tie-in darkrooms.
The project was completed safely, on schedule and to a high standard.